Film 00 - Factory
Data center module - 16.35 × 3.20 × 3.20 m
Get in touch
THIS FILM NEEDS WEBGL.
OPEN IT IN SAFARI OR CHROME.
01 Build
02 Load
03 Ship
04 Install
0%

The journey - 01 - Build

Built indoors.
Every part of it.

Frame, envelope, racks, cooling, power. Assembled and tested in the hall, under a crane, in dry air. Scroll to follow one container to its pad.

02 - Load

One lift,
then standard width.

The finished container goes onto a low-bed in a single lift. 16.35 by 3.20 by 3.20 metres travels on a single extendable trailer, chillers already integrated in the end bays.

03 - Ship

Lifted like
any other box.

Quay crane, corner castings, twist locks, lashing. The same container reaches Constanța, Alexandria or Rotterdam without being opened.

04 - Install

Set down
once.

A mobile crane, a level pad, power and data at the end wall. Then the lights come on.

Film - scroll to scrub - Legacy container from the configurator - vehicles and sets drawn

Scroll